To create a comprehensive design guideline and a material and construction standard
for geofoam used as lightweight fill in roadway embankments, the American Association
of State Highway and Transportation Officials (AASHTO), in cooperation with the
Federal Highway Administration (FHWA), funded National Cooperative Highway Research
Program (NCHRP) Project 24-11 titled “Guidelines for Geofoam Applications in Embankment
Projects.” The NCHRP research was conducted from July 6, 1999 to August 31, 2002.
The results of this NCHRP project are presented in two reports. One report includes
only the design guideline and the material and construction standard for use of
geofoam in stand-alone roadway embankments: The second report includes the background
and analyses used to develop the design guideline and material and construction
standard as well as a summary of the engineering properties of EPS-block geofoam
and an economic analysis of geofoam versus other lightweight fill materials.
- “NCHRP Report 529: Guideline and Recommended Standard for Geofoam Applications in
Highway Embankments”. Available at
http://trb.org/publications/nchrp/nchrp_rpt_529.pdf (71 pages, 1.6mb)
- “NCHRP Web Document 65 (Project 24-11) Geofoam Applications in the Design and Construction
of Highway Embankments”. Available at
http://trb.org/publications/nchrp/nchrp_w65.pdf (792 pages, 10.3 mb)
Close
Geofoam Specification for Transportation Applications
PART 1 General
- This specification covers the types, physical properties and dimensions of expanded
polystyrene (EPS) intended for use as Geofoam.
- This specification does not cover the layout, placement and workmanship for proper
installation and performance of Geofoam.
- Geofoam shall be protected from certain chemicals, fire sources, extended exposure
to sunlight, and concentrated loads. Specific design considerations with Geofoam
may include strength, deformation, thermal conductivity and buoyancy.
- This specification does not purport to address all of the safety concerns, if any,
associated with its use. It is the responsibility of the user to establish appropriate
safety and health practices and to determine the applicability of specific regulatory
limitations prior to use.
PART 2 Referenced ASTM Standards
2.1 ASTM D 6817-07 Standard Specification for Rigid,
Cellular Polystyrene Geofoam
2.2 ASTM C-578-08b Standard Specification for Rigid Cellular Polystyrene
Insulation
2.3 ASTM D-1621 Test Method for Compressive Properties
of Rigid Cellular Plastics
2.4 ASTM D-1622 Test Method for Apparent Density of Rigid Cellular
Plastics
PART 3 Terminology
3.1 Definitions:
3.2 Terms used in this specification are defined in Terminology
D 4439.
Geofoam—block or planar rigid cellular foam polymeric material used in geotechnical
engineering applications.
3.3 Definitions of Terms Specific to This Standard:
3.4 EPS, XX—number designation for expanded polystyrene Geofoam
Type(s) having a minimum density of XX
kg/m3(lb/ft3).
3.5 RCPS—letter designation for EPS and XPS rigid cellular polystyrene
geofoam covered by this specification.
PART 4 Submittals
4.1 General: Submit listed submittals in accordance with Conditions
of the Contract and Division 1 Submittal Procedures Section.
4.2 Product Data: Submit product data, including manufacturer´s
DATA SHEET, for specified products.
4.3 Shop Drawings: Submit shop drawings showing layout, profiles
and product components.
4.4 Quality Assurance Submittals: Submit the following:
4.4.1 Test Compliance: Summary of test compliance with specified
performance characteristics and physical properties.
4.4.2 Certificates: Product certificates signed by manufacturer
certifying materials comply with specified performance characteristics and criteria,
and physical requirements. Manufacturer shall supply a hard copy product certificate
showing Third Party Quality Control.
PART 5 Quality Assurance
5.1 Installer Qualifications: Installer experienced in performing
work of this section who has specialized in installation of work similar to that
required for this project.
5.2 Regulatory Requirements: [ Specify applicable
requirements of regulatory agencies. ]
Specifier Note: (1) Installation must
comply with the requirements of all applicable local, state and national jurisdictions.
(2) Approvals: EPS (Geofoam) is made to exacting standards monitored by Underwriters
Laboratories. Contact Falcon Foam for applicable compliance information.
5.3 Pre-installation Meetings: Conduct pre-installation meeting
to verify project requirements, substrate conditions, installation instructions,
and manufacturer´s warranty requirements. Comply with Division 1 Project Management
and Coordination (Project Meetings) Section.
PART 6 Delivery, Storage & Handling
6.1 General: Comply with Division 1 Product Requirements Sections.
6.2 Ordering: Comply with manufacturer´s ordering instructions
and lead-time requirements to avoid construction delays.
6.3 Delivery: Deliver materials in manufacturer´s original packaging
with identification marks intact.
Storage and Protection: Store materials protected from damage.
PART 7 Warranty
7.1 Project Warranty: Refer to Conditions of the Contract for project
warranty provisions.
- Manufacturer´s Warranty: Submit, for Owner´s acceptance, manufacturer´s standard
warranty document executed by authorized company official. Manufacturer´s warranty
is in addition to, and not a limitation of, other rights Owner may have under Contract
Documents.
Specifier Note: Coordinate paragraph below with manufacturer´s
warranty requirements. Falcon Foam provides a warranty covering compliance to ASTM
D 6817-07 for its EPS Geofoam. Contact the manufacturer for details regarding the warranty
program.
Warranty Period: [ Specify term. ]
years commencing on Date of Substantial Completion.
PART 8 Products
Specifier Note: Retain article below for proprietary method specification.
Add product attributes, performance characteristics, material standards, and descriptions
as applicable. Use of such phrases as "or equal" or "or approved equal," or similar
phrases may cause ambiguity in specifications. Such phrases require verification
(procedural, legal and regulatory) and assignment of responsibility for determining
"or equal" products.
8.1 Manufacturer: Falcon Foam, A Division of Atlas Roofing Corporation
8240 Byron Center Road, Byron Center, MI 49315
Telephone: (800) 917-9138; Fax: (800) 626-9942
Specifier Note: (1) Please refer to Falcon Foam DATA SHEET for
performance properties.
- Limitations: EPS contains a flame retardant additive; however,
it should be considered combustible. It should not be stored near open flames or
any source of ignition.
Expanded Polystyrene Block: Expanded polystyrene block shall
be “Falcon Foam Geofoam” as manufactured by Falcon Foam, a Division of Atlas Roofing
Corporation. The EPS Block shall conform to ASTM D6817-07 and shall be Type
[ Specify. ] with a density of
[ Specify. ] lbs. Per cubic foot and a minimum compressive stress
of [ Specify. ] at 1% deformation.
The other properties shall be as follows:
|
Thermal Resistance (1.0 in. thickness), min.
|
|
|
@ 40F
|
[ Specify. ] F ft2 h/BTU
|
|
@ 75F
|
[ Specify. ] F ft2 h/BTU
|
|
Compressive Strength (at 10% deformation), min.
|
[ Specify. ] psi
|
|
Flexural Strength, min.
|
[ Specify. ] psi
|
|
Modulus of Elasticity, min.
|
[ Specify. ] psi
|
|
Dimensional Stability, max.
|
[ Specify. ] %
|
8.2 Falcon Geofoam Connector Plates: The Geofoam Connector
Plate shall be used to restrain Geofoam from moving laterally in layer over layer
applications. The Geofoam Connector Plate shall be supplied by Falcon Foam.
The plate shall be made of galvanized steel with two-sided multi-barbed design capable
of piercing geofoam. Each plate shall be capable of a lateral holding strength
of 60 lbs. It is the responsibility of the designer/applicator to determine
the load requirement of the project for determining the number of Geofoam Connector
Plates needed. However, two plates for each 4’ x 8’ section of EPS block is
a minimum recommendation.
Specifier Note: Edit article below to suit project requirements.
If substitutions are permitted, edit text below. Add text to refer to Division Project
Requirements (Product Substitutions Procedures) Section.
8.3 PRODUCT SUBSTITUTIONS
Substitutions: No substitutions permitted.
8.4 RELATED MATERIALS
Related Materials: Refer to other sections for related materials
as follows:
8.5 SOURCE QUALITY
Source Quality Assurance: Each system component required shall
be supplied by manufacturer and shall be obtained from selected manufacturer or
its approved supplier.
Source Quality: Obtain lightweight EPS Geofoam from a single manufacturer.
PART 9 Execution
Specifier Note: Revise article below to suit project requirements
and specifier´s practice.
- Manufacturers instructions: Comply with manufacturer´s product
data, including product technical bulletins, and product catalog.
PART 10 Examination
- Site Verification of Conditions:
- Verify substrate conditions, which have been previously installed under other sections,
are acceptable for product installation in accordance with manufacturer´s instructions.
10.3 Verify conditions of substrate, grade and other conditions
which affect installation of geofoam. Any adverse conditions shall be reported in
writing. Do not proceed with installation until adverse conditions are corrected.
10.4 Verify details prior to starting Geofoam installation.
- Verify base preparation to support the Geofoam.
PART 11 Preparation
11.1 Surface Preparation: [ Specify applicable
product preparation requirements. ]
Specifier Note: Coordinate article below with recommended installation
details and requirements.
PART 12 Installation
Specifier Note: Falcon Foam recommends installation shall be in
accordance with published instructions, details and the drawings that are part of
the contract documents for project. Conflicts between these documents shall be resolved
in writing.
12.1 Installation: [ Specify instructions
to suit project requirements. ]
12.2 Site Tolerances: [ Specify applicable
site tolerances for specified product(s) installation. ]
12.3 Related Products Installation: Refer to other sections listed
in Related Sections paragraph herein for related products installation.
PART 13 Field Quality Requirements
Specifier Note: Edit paragraph below. Establish number and duration
of periodic site visits with Owner and manufacturer, and specify below. Consult
with manufacturer for services required. Coordinate paragraph below with Division
1 Quality Assurance Section and Part 1 Quality Assurance Submittals herein. Delete
if manufacturer´s field service not required.
13.1 Manufacturer´s Field Services: Upon Owner´s request, provide
manufacturer´s field service consisting of periodic site visit for inspection of
product.
Site Visits: [ Specify number and duration
of periodic site visits. ]
PART 14 Cleaning
14.1 Remove temporary coverings and protection of adjacent work
areas. Repair or replace damaged installed products. Remove construction debris
from project site and legally dispose of debris.
PART 15 Protection
- Protect installed product and finish surfaces from damage during construction.
- Prolonged exposure to sunlight can lead to discoloration and dusting due to ultraviolet
(UV) degradation. Property changes related to UV degradation are superficial
in nature. Once installed and properly covered UV degradation will not be an
important concern for belowground geofoam applications. Discoloration and dusting
due to prolonged sunlight exposure can be minimized by covering the geofoam stockpile
with opaque sheeting during extended periods of open-air storage.
Geofoam is combustible and protecting against fire hazard is important. Smoking
and the use of open flames, such as welding, near Geofoam should be strictly prohibited.
Close
Geofoam Specification for Non-Transportation Applications
PART 1 General
- This specification covers the types, physical properties and dimensions of expanded
polystyrene (EPS) intended for use as Geofoam.
- This specification does not cover the layout, placement and workmanship for proper
installation and performance of Geofoam.
- Geofoam shall be protected from certain chemicals, fire sources, extended exposure
to sunlight, and concentrated loads. Specific design considerations with Geofoam
may include strength, deformation, thermal conductivity and buoyancy.
- This specification does not purport to address all of the safety concerns, if any,
associated with its use. It is the responsibility of the user to establish appropriate
safety and health practices and to determine the applicability of specific regulatory
limitations prior to use.
PART 2 Referenced ASTM Standards
2.1 ASTM D 6817-07 Standard Specification for Rigid,
Cellular Polystyrene Geofoam
2.2 ASTM C-578-08b Standard Specification for Rigid Cellular Polystyrene
Insulation
2.3 ASTM D-1621 Test Method for Compressive Properties
of Rigid Cellular Plastics
2.4 ASTM D-1622 Test Method for Apparent Density of Rigid Cellular
Plastics
PART 3 Terminology
3.1 Definitions:
3.2 Terms used in this specification are defined in Terminology
D 4439.
Geofoam—block or planar rigid cellular foam polymeric material used in geotechnical
engineering applications.
3.3 Definitions of Terms Specific to This Standard:
3.4 EPS, XX—number designation for expanded polystyrene Geofoam
Type(s) having a minimum density of XX
kg/m3(lb/ft3).
3.5 RCPS—letter designation for EPS and XPS rigid cellular polystyrene
geofoam covered by this specification.
PART 4 Submittals
4.1 General: Submit listed submittals in accordance with Conditions
of the Contract and Division 1 Submittal Procedures Section.
4.2 Product Data: Submit product data, including manufacturer´s
DATA SHEET, for specified products.
4.3 Shop Drawings: Submit shop drawings showing layout, profiles
and product components.
4.4 Quality Assurance Submittals: Submit the following:
4.4.1 Test Compliance: Summary of test compliance with specified
performance characteristics and physical properties.
4.4.2 Certificates: Product certificates signed by manufacturer
certifying materials comply with specified performance characteristics and criteria,
and physical requirements. Manufacturer shall supply a hard copy product certificate
showing Third Party Quality Control.
PART 5 Quality Assurance
5.1 Installer Qualifications: Installer experienced in performing
work of this section who has specialized in installation of work similar to that
required for this project.
5.2 Regulatory Requirements: [ Specify applicable
requirements of regulatory agencies. ]
Specifier Note: (1) Installation must
comply with the requirements of all applicable local, state and national jurisdictions.
(2) Approvals: EPS (Geofoam) is made to exacting standards monitored by Underwriters
Laboratories. Contact Falcon Foam for applicable compliance information.
5.3 Pre-installation Meetings: Conduct pre-installation meeting
to verify project requirements, substrate conditions, installation instructions,
and manufacturer´s warranty requirements. Comply with Division 1 Project Management
and Coordination (Project Meetings) Section.
PART 6 Delivery, Storage & Handling
6.1 General: Comply with Division 1 Product Requirements Sections.
6.2 Ordering: Comply with manufacturer´s ordering instructions
and lead-time requirements to avoid construction delays.
6.3 Delivery: Deliver materials in manufacturer´s original packaging
with identification marks intact.
Storage and Protection: Store materials protected from damage.
PART 7 Warranty
7.1 Project Warranty: Refer to Conditions of the Contract for project
warranty provisions.
- Manufacturer´s Warranty: Submit, for Owner´s acceptance, manufacturer´s standard
warranty document executed by authorized company official. Manufacturer´s warranty
is in addition to, and not a limitation of, other rights Owner may have under Contract
Documents.
Specifier Note: Coordinate paragraph below with manufacturer´s
warranty requirements. Falcon Foam provides a warranty covering compliance to ASTM
D 6817-07 for its EPS Geofoam. Contact the manufacturer for details regarding the warranty
program.
Warranty Period: [ Specify term. ]
years commencing on Date of Substantial Completion.
PART 8 Products
Specifier Note: Retain article below for proprietary method specification.
Add product attributes, performance characteristics, material standards, and descriptions
as applicable. Use of such phrases as "or equal" or "or approved equal," or similar
phrases may cause ambiguity in specifications. Such phrases require verification
(procedural, legal and regulatory) and assignment of responsibility for determining
"or equal" products.
8.1 Manufacturer: Falcon Foam, A Division of Atlas Roofing Corporation
8240 Byron Center Road, Byron Center, MI 49315
Telephone: (800) 917-9138; Fax: (800) 626-9942
Specifier Note: (1) Please refer to Falcon Foam DATA SHEET for
performance properties.
- Limitations: EPS contains a flame retardant additive; however,
it should be considered combustible. It should not be stored near open flames or
any source of ignition.
Expanded Polystyrene Block: Expanded polystyrene block shall
be “Falcon Foam Geofoam” as manufactured by Falcon Foam, a Division of Atlas Roofing
Corporation. The EPS Block shall conform to ASTM D6817-07 and shall be Type
[ Specify. ] with a density of
[ Specify. ] lbs. Per cubic foot and a minimum compressive stress
of [ Specify. ] at 1% deformation.
The other properties shall be as follows:
|
Thermal Resistance (1.0 in. thickness), min.
|
|
|
@ 40F
|
[ Specify. ] F ft2 h/BTU
|
|
@ 75F
|
[ Specify. ] F ft2 h/BTU
|
|
Compressive Strength (at 10% deformation), min.
|
[ Specify. ] psi
|
|
Flexural Strength, min.
|
[ Specify. ] psi
|
|
Modulus of Elasticity, min.
|
[ Specify. ] psi
|
|
Dimensional Stability, max.
|
[ Specify. ] %
|
8.2 Falcon Geofoam Connector Plates: The Geofoam Connector
Plate shall be used to restrain Geofoam from moving laterally in layer over layer
applications. The Geofoam Connector Plate shall be supplied by Falcon Foam.
The plate shall be made of galvanized steel with two-sided multi-barbed design capable
of piercing geofoam. Each plate shall be capable of a lateral holding strength
of 60 lbs. It is the responsibility of the designer/applicator to determine
the load requirement of the project for determining the number of Geofoam Connector
Plates needed. However, two plates for each 4’ x 8’ section of EPS block is
a minimum recommendation.
Specifier Note: Edit article below to suit project requirements.
If substitutions are permitted, edit text below. Add text to refer to Division Project
Requirements (Product Substitutions Procedures) Section.
8.3 PRODUCT SUBSTITUTIONS
Substitutions: No substitutions permitted.
8.4 RELATED MATERIALS
Related Materials: Refer to other sections for related materials
as follows:
8.5 SOURCE QUALITY
Source Quality Assurance: Each system component required shall
be supplied by manufacturer and shall be obtained from selected manufacturer or
its approved supplier.
Source Quality: Obtain lightweight EPS Geofoam from a single manufacturer.
PART 9 Execution
Specifier Note: Revise article below to suit project requirements
and specifier´s practice.
- Manufacturers instructions: Comply with manufacturer´s product
data, including product technical bulletins, and product catalog.
PART 10 Examination
- Site Verification of Conditions:
- Verify substrate conditions, which have been previously installed under other sections,
are acceptable for product installation in accordance with manufacturer´s instructions.
10.3 Verify conditions of substrate, grade and other conditions
which affect installation of geofoam. Any adverse conditions shall be reported in
writing. Do not proceed with installation until adverse conditions are corrected.
10.4 Verify details prior to starting Geofoam installation.
- Verify base preparation to support the Geofoam.
PART 11 Preparation
11.1 Surface Preparation: [ Specify applicable
product preparation requirements. ]
Specifier Note: Coordinate article below with recommended installation
details and requirements.
PART 12 Installation
Specifier Note: Falcon Foam recommends installation shall be in
accordance with published instructions, details and the drawings that are part of
the contract documents for project. Conflicts between these documents shall be resolved
in writing.
12.1 Installation: [ Specify instructions
to suit project requirements. ]
12.2 Site Tolerances: [ Specify applicable
site tolerances for specified product(s) installation. ]
12.3 Related Products Installation: Refer to other sections listed
in Related Sections paragraph herein for related products installation.
PART 13 Field Quality Requirements
Specifier Note: Edit paragraph below. Establish number and duration
of periodic site visits with Owner and manufacturer, and specify below. Consult
with manufacturer for services required. Coordinate paragraph below with Division
1 Quality Assurance Section and Part 1 Quality Assurance Submittals herein. Delete
if manufacturer´s field service not required.
13.1 Manufacturer´s Field Services: Upon Owner´s request, provide
manufacturer´s field service consisting of periodic site visit for inspection of
product.
Site Visits: [ Specify number and duration
of periodic site visits. ]
PART 14 Cleaning
14.1 Remove temporary coverings and protection of adjacent work
areas. Repair or replace damaged installed products. Remove construction debris
from project site and legally dispose of debris.
PART 15 Protection
- Protect installed product and finish surfaces from damage during construction.
- Prolonged exposure to sunlight can lead to discoloration and dusting due to ultraviolet
(UV) degradation. Property changes related to UV degradation are superficial
in nature. Once installed and properly covered UV degradation will not be an
important concern for belowground geofoam applications. Discoloration and dusting
due to prolonged sunlight exposure can be minimized by covering the geofoam stockpile
with opaque sheeting during extended periods of open-air storage.
Geofoam is combustible and protecting against fire hazard is important. Smoking
and the use of open flames, such as welding, near Geofoam should be strictly prohibited.
Close